Task Started: Continued detailing marina slips
Tasks Completed: N/A
Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample. Calendar. Add boat slips. Add depth contour lines.
Friday, January 29, 2010
Friday, January 22, 2010
Log 1/22
Task Started: Breakwater design.
Tasks Completed: Breakwater Design. Modified developmental work
Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample.
Tasks Completed: Breakwater Design. Modified developmental work
Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample.
Wednesday, January 20, 2010
Log 1/20
Task Started: Breakwater design.
Tasks Completed: Formal Report Updated. Mentor Contacts
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work.
Tasks Completed: Formal Report Updated. Mentor Contacts
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work.
Monday, January 11, 2010
Developmental Work
Layout
Strucutal Plan
Boom Attachment
Materials List
1 Oil absorbent polypropylene fabric boom
Quantity: 40
Size: 8” diameter x 20’
Remarks: Cleans water of petroleum based oils
2 Piling Cap
Quantity: 385
Size: 10’x2’x1’
Remarks: Made from reinforced concrete
3 Trex Decking Material
Quantity: 13110
Size: 10’x6”x2”
Remarks: Decking Material
4 Pilings
Quantity: 754
Size: t-1’, b-8”x 16’
Remarks: Made from reinforced concrete
5 WhisprWave Floating Breakwater
Quantity: 1
Size: 1600’ long
Strucutal Plan
Boom Attachment
Materials List
1 Oil absorbent polypropylene fabric boom
Quantity: 40
Size: 8” diameter x 20’
Remarks: Cleans water of petroleum based oils
2 Piling Cap
Quantity: 385
Size: 10’x2’x1’
Remarks: Made from reinforced concrete
3 Trex Decking Material
Quantity: 13110
Size: 10’x6”x2”
Remarks: Decking Material
4 Pilings
Quantity: 754
Size: t-1’, b-8”x 16’
Remarks: Made from reinforced concrete
5 WhisprWave Floating Breakwater
Quantity: 1
Size: 1600’ long
Wednesday, January 6, 2010
Log 1/06
Task Started: Modifying marina layout. Stemm Report
Tasks Completed: Stemm Report
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work. Mentor Contacts
Tasks Completed: Stemm Report
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work. Mentor Contacts
Friday, December 18, 2009
Log 12/18
Task Started: Modifying marina layout. Isometric boom design
Tasks Completed: Completed isometric boom design.
Tasks to be Completed: Complete calculation of number of wind turbines. Complete modifing marina layout. Complete mooring design. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Complete electrical and gasoline plan. Complete plan of proceedures.
Tasks Completed: Completed isometric boom design.
Tasks to be Completed: Complete calculation of number of wind turbines. Complete modifing marina layout. Complete mooring design. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Complete electrical and gasoline plan. Complete plan of proceedures.
Wednesday, December 16, 2009
Log 12/16
Task Started: Modifying marina layout. Isometric structure design.
Tasks Completed: Completed isometric structure design.
Tasks to be Completed: Complete calculation of number of wind turbines. Complete modifing marina layout. Complete mooring design. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Complete electrical and gasoline plan. Complete isometric boom design. Complete plan of proceedures
Tasks Completed: Completed isometric structure design.
Tasks to be Completed: Complete calculation of number of wind turbines. Complete modifing marina layout. Complete mooring design. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Complete electrical and gasoline plan. Complete isometric boom design. Complete plan of proceedures
Subscribe to: