Friday, January 29, 2010

Log 1/29

Task Started: Continued detailing marina slips
Tasks Completed: N/A

Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample. Calendar. Add boat slips. Add depth contour lines.

Friday, January 22, 2010

Log 1/22

Task Started: Breakwater design.


Tasks Completed: Breakwater Design. Modified developmental work

Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample.

Wednesday, January 20, 2010

Log 1/20

Task Started: Breakwater design.


Tasks Completed: Formal Report Updated. Mentor Contacts

Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work.

Monday, January 11, 2010

Developmental Work

Layout


Strucutal Plan





Boom Attachment






Materials List

1 Oil absorbent polypropylene fabric boom
   Quantity: 40
   Size: 8” diameter x 20’
   Remarks: Cleans water of petroleum based oils

2 Piling Cap
   Quantity: 385
   Size: 10’x2’x1’
   Remarks: Made from reinforced concrete

3 Trex Decking Material
   Quantity: 13110
   Size: 10’x6”x2”
   Remarks: Decking Material

4 Pilings
   Quantity: 754
   Size: t-1’, b-8”x 16’
   Remarks: Made from reinforced concrete

5 WhisprWave Floating Breakwater
   Quantity: 1
   Size: 1600’ long

Wednesday, January 6, 2010

Log 1/06

Task Started: Modifying marina layout. Stemm Report


Tasks Completed: Stemm Report
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work. Mentor Contacts