Testing
The final solution is a green marina. It is expected to perform all necessary functions of a marina while being ecologically friendly. The design is expected to prevent erosion, absorb any gasoline leaked into the water, provide slips for 400 boats, and accommodate boats up to 90 feet long. The design of the marina is going to be tested. This includes the layout of the docks and how well the marina functions as a whole to be ecologically friendly. The final solution will be evaluated by a marine recreational agent. The evaluation would take place during a sit-down interview.
Exploratory Test
Preliminary Testing
1. Schedule meeting with a marine environmental agent to discuss the concept of the design
2. Provide all drawings of final solution and necessary documents
3. Have environmental agent evaluate the concept of the design using the following:
a. Does design contain all necessary parts of a marina?
b. Does design use docking materials efficiently?
c. Does design affect local plants and animals?
d. Does design minimize water pollution?
e. Does design minimize erosion?
f. Does design provide protection from incoming waves?
g. Does design function for all size boats?
h. Does marina function for commercial and recreational boats?
i. Does marina function for all users?
j. Does design follow regulations set forth by the state of New Jersey?
k. Does design meet all requirements for a green marina?
l. Does design meet the needs of boaters?
m. Comments:
4. If changes to design are needed make necessary changes and schedule another meeting
Secondary Testing
1. Meet with a marine environmental agent
2. Provide all drawings of final solution and necessary documents
3. Have environmental agent evaluate the concept of the design using the following:
a. Does design contain all necessary parts of a marina?
b. Does design use docking materials efficiently?
c. Does design affect local plants and animals?
d. Does design minimize water pollution?
e. Does design minimize erosion?
f. Does design provide protection from incoming waves?
g. Does design function for all size boats?
h. Does marina function for commercial and recreational boats?
i. Does marina function for all users?
j. Does design follow regulations set forth by the state of New Jersey?
k. Does design meet all requirements for a green marina?
l. Does design meet the needs of boaters?
m. Comments:
4. If changes to design are needed make necessary changes and schedule another meeting and repeat steps 1-4 for Tertiary Testing
Validation Tests
Primary
1. Schedule meeting with a marine environmental agent
2. Provide all drawings of final solution and necessary documents
3. Have environmental agent evaluate the final solution to ensure all design goals have been met using the following:
a. Does design contain all necessary parts of a marina?
b. Does design match with design of civil engineer?
c. Does design use dock materials efficiently?
d. Does design use materials that are ecologically friendly?
e. Does design use materials that are long lasting?
f. Does design use renewable energy efficiently?
g. Does design affect local plants and animals?
h. Does design minimize water pollution?
i. Does design prevent pollutants from entering the bay?
j. Does design rid gasoline leaked into the water?
k. Does design provide slips for 400 boats?
l. Does design accommodate boats up to 90 feet long?
m. Does design minimize erosion?
n. Does design provide protection from incoming waves
o. Does design function for all size boats?
p. Does marina function for commercial and recreational boats?
q. Does marina function for all users?
r. Does design follow all regulations set forth by the state of New Jersey?
s. Does design meet all requirements for a green marina?
t. Comments:
Friday, September 25, 2009
Brainstorming
Brainstorming
• Boats will leak gasoline
o Use oil absorbent polypropylene fabric boom filled with microbes to consume gasoline
o Float oil spill control fabric in the water to absorb the gasoline
• Renewable energy source
o Install solar panels to create electricity
o Install wind turbines to create electricity
• Docks need to be replaced every few years
o Use fiberglass reinforced plastic in dock construction
o Use reinforced concrete in dock construction
o Use ipe wood in dock construction
o Use Trex decking in dock construction
• Shoreline will erode
o Place WhisprWave floating breakwater parallel to shoreline to prevent wave action against the shore
o Build an artificial salt marsh parallel to shoreline to prevent wave action against the shore
• Waves and wakes from boats disrupt the marina
o Place WhisprWave floating breakwater parallel to shoreline to prevent wave action against the shore
o Build an artificial salt marsh parallel to shoreline to prevent wave action against the shore
• Fishing line and garbage is often discarded in the water
o Place more garbage cans in high-traffic areas
o Skim surface with net
• Boats will leak gasoline
o Use oil absorbent polypropylene fabric boom filled with microbes to consume gasoline
o Float oil spill control fabric in the water to absorb the gasoline
• Renewable energy source
o Install solar panels to create electricity
o Install wind turbines to create electricity
• Docks need to be replaced every few years
o Use fiberglass reinforced plastic in dock construction
o Use reinforced concrete in dock construction
o Use ipe wood in dock construction
o Use Trex decking in dock construction
• Shoreline will erode
o Place WhisprWave floating breakwater parallel to shoreline to prevent wave action against the shore
o Build an artificial salt marsh parallel to shoreline to prevent wave action against the shore
• Waves and wakes from boats disrupt the marina
o Place WhisprWave floating breakwater parallel to shoreline to prevent wave action against the shore
o Build an artificial salt marsh parallel to shoreline to prevent wave action against the shore
o Place more garbage cans in high-traffic areas
o Skim surface with net
Specifications and Limitations
Specifications:
The design must provide all facilities and services to those who use the harbor
The design must provide adequate parking for all harbor facilities
The design must accommodate boats on land
The design must contain an attractive entrance
The design must plant two trees for ever tree removed
The design must maximize water conservation
The design must minimize water pollution in the form of water run-off and oil spillage
The design must contain vegetation
The design must minimize the use of impervious materials and buildings
The design must include adequate lighting and drainage
The design must prevent erosion
The design must absorb any gasoline leaked into the water
The design must provide slips for 400 boats
The design must accommodate boats up to 90 feet long
The design must provide freshwater access
The design must provide a full service fuel dock with a sanitary pump-out station
The design must provide an 88 ton travel lift and yard
The design must provide bulkhead and retaining walls
The design must minimize the need for and impact of dredging
The design must use stationary docking
The design must minimize water and land pollution
The design must provide protection from incoming waves
Limitations:
The design must adhere to Green Marina compliances
The design must not extend beyond the current perimeter of the harbor
The design must not remove facilities unless the facilities are being replaced by more eco-friendly versions
The design must separate roads from parking areas
The design must not contain more than 40% impervious areas
The design must avoid the intersection of roads
The design must minimize the disturbance of the existing site
The design must adhere to Atlantic Highlands and New Jersey restrictions and regulations
The design must prevent the introduction of pollutants into the bay
The design must use renewable energy in the form of wind turbines and solar panels
The design must be built using long-lasting, environmentally friendly materials
The design must provide all facilities and services to those who use the harbor
The design must provide adequate parking for all harbor facilities
The design must accommodate boats on land
The design must contain an attractive entrance
The design must plant two trees for ever tree removed
The design must maximize water conservation
The design must minimize water pollution in the form of water run-off and oil spillage
The design must contain vegetation
The design must minimize the use of impervious materials and buildings
The design must include adequate lighting and drainage
The design must prevent erosion
The design must absorb any gasoline leaked into the water
The design must provide slips for 400 boats
The design must accommodate boats up to 90 feet long
The design must provide freshwater access
The design must provide a full service fuel dock with a sanitary pump-out station
The design must provide an 88 ton travel lift and yard
The design must provide bulkhead and retaining walls
The design must minimize the need for and impact of dredging
The design must use stationary docking
The design must minimize water and land pollution
The design must provide protection from incoming waves
Limitations:
The design must adhere to Green Marina compliances
The design must not extend beyond the current perimeter of the harbor
The design must not remove facilities unless the facilities are being replaced by more eco-friendly versions
The design must separate roads from parking areas
The design must not contain more than 40% impervious areas
The design must avoid the intersection of roads
The design must minimize the disturbance of the existing site
The design must adhere to Atlantic Highlands and New Jersey restrictions and regulations
The design must prevent the introduction of pollutants into the bay
The design must use renewable energy in the form of wind turbines and solar panels
The design must be built using long-lasting, environmentally friendly materials
Design Brief
Team Design Brief: To plan and design a green marina for Atlantic Highlands, NJ 07716 for year-round use by the citizens of Atlantic Highlands. Produce a scaled model as a visual representation of this design.
Individual Design Brief: To plan and design a green marina for Atlantic Highlands, NJ 07716, as a structural engineer, from the waterline out including the design the docks for commercial and recreational boats, inclusion of energy sources for the boats, and coastal structures such as bulkheads, breakwaters, and groins. The design must align with the civil engineering site plan of the marina and must be designed using the current perimeter of the Atlantic Highlands Marina. Produce a scaled model as a visual representation of this design.
Individual Design Brief: To plan and design a green marina for Atlantic Highlands, NJ 07716, as a structural engineer, from the waterline out including the design the docks for commercial and recreational boats, inclusion of energy sources for the boats, and coastal structures such as bulkheads, breakwaters, and groins. The design must align with the civil engineering site plan of the marina and must be designed using the current perimeter of the Atlantic Highlands Marina. Produce a scaled model as a visual representation of this design.
Thursday, September 17, 2009
Selection/Rejection/Intention Report
Selection/Rejection/Intention Report
Solution one is a very simple dock layout. The main docks in the design are long and “t” shaped. Wind turbines are placed at the end of each dock to supply power for the boats. Oil absorbent polypropylene fabric booms are scattered throughout the design. The farther left on the design, the more booms there are. This is because the current travels in this direction and most of the gasoline will be pushed to this side of the design. A floating breakwater is placed parallel to the shoreline to help prevent erosion. Garbage cans are placed at the ends of the docks to encourage people to throw away their garbage.
There are many pros and few cons of this design. This design is able to prevent erosion through the floating breakwater. The design allows pollutants to be contained inside the marina while absorbing and ridding of gasoline. The boats in this design will charge their batteries through the use of energy efficient wind turbines. This design is able to provide the most amount of slips in the smallest space. The design uses ecologically friendly materials that will last a long time. It is able to accommodate all boat sizes including a ninety foot boat. The design also follows regulations set by the State of New Jersey. The only con of this solution is that the reinforced concrete will decay faster than regular concrete due to the internal metal rods.
Solution two is a fairly simple dock layout. The main docks in the design are long and “l” shaped. Wind turbines are placed at the end of each dock to supply power for the boats. Oil spill control fabric is scattered throughout the design. The farther left on the design, the more bundles of fabric there will be. This is because the current travels in this direction and most of the gasoline will be pushed to this side of the design. These will have to be replaced once the fabric cannot hold any more gasoline. A floating breakwater is placed parallel to the shoreline to help prevent erosion. Garbage cans are placed at the middle and end of the docks to encourage people to throw away their garbage.
There are many pros and cons of this design. This design is able to prevent erosion through the floating breakwater. The design allows pollutants to be contained inside the marina while absorbing gasoline. The boats in this design will charge their batteries through the use of energy efficient wind turbines. This design is able to provide the necessary amount of slips. The design uses ecologically friendly materials that will last a long time. It is able to accommodate all boat sizes including a ninety foot boat. The design also follows regulations set by the State of New Jersey. A few drawbacks of this design are that the oil spill control fabric bundles will have to be replaced when they cannot hold any more gasoline. The design does not allow the marina to grow and add more boats. The design also uses plastic, which has the potential to leech harmful chemicals.
Solution three is a more complex dock layout. The main docks in the design are shaped differently. The design is fairly symmetrical. The two main docks in the center are hook shaped while the outer main docks are in the shape of a goalpost. Smaller docks are placed in between the main docks. Wind turbines are placed at the end of each dock to supply power for the boats. Oil absorbent polypropylene fabric booms are scattered throughout the design. The farther left on the design, the more fabric booms there will be. This is because the current travels in this direction and most of the gasoline will be pushed to this side of the design. An artificial salt marsh is placed parallel to the shoreline to help prevent erosion and help the local ecosystem. Garbage cans are placed at the end, middle and front of the docks to encourage people to throw away their garbage.
There are many pros and cons of this design. This design is able to prevent erosion through the artificial salt marsh while helping the local ecosystem at the same time. The design allows pollutants to be contained inside the marina while absorbing and ridding of gasoline. The boats in this design will charge their batteries through the use of energy efficient wind turbines. The design also follows regulations set by the State of New Jersey. However, this design is not able to provide the necessary amount of slips. The design also uses materials that will last a long time but are sometimes overharvested. It is able to accommodate boats of most sizes but not including the ninety foot boat. The design does not allow the marina to grow and add more boats.
The final solution chosen was solution one. This solution is intended to be developed. It was chosen because it was able to meet the specifications the best, sometimes outperforming the necessary requirements. Most elements of the design were beneficial to having a green marina. The only con of the design was the material chosen to make this design out of. Solutions one and two were very close but solution one was more distinguished in the fact that it was able to hold more than the required number of boats in less space. Solution three was more of an experimental design with the layout. In the end, Solution one was chosen because it was able to meet the specifications the best.
Specification Analysis Chart
There are many pros and few cons of this design. This design is able to prevent erosion through the floating breakwater. The design allows pollutants to be contained inside the marina while absorbing and ridding of gasoline. The boats in this design will charge their batteries through the use of energy efficient wind turbines. This design is able to provide the most amount of slips in the smallest space. The design uses ecologically friendly materials that will last a long time. It is able to accommodate all boat sizes including a ninety foot boat. The design also follows regulations set by the State of New Jersey. The only con of this solution is that the reinforced concrete will decay faster than regular concrete due to the internal metal rods.
There are many pros and cons of this design. This design is able to prevent erosion through the floating breakwater. The design allows pollutants to be contained inside the marina while absorbing gasoline. The boats in this design will charge their batteries through the use of energy efficient wind turbines. This design is able to provide the necessary amount of slips. The design uses ecologically friendly materials that will last a long time. It is able to accommodate all boat sizes including a ninety foot boat. The design also follows regulations set by the State of New Jersey. A few drawbacks of this design are that the oil spill control fabric bundles will have to be replaced when they cannot hold any more gasoline. The design does not allow the marina to grow and add more boats. The design also uses plastic, which has the potential to leech harmful chemicals.
There are many pros and cons of this design. This design is able to prevent erosion through the artificial salt marsh while helping the local ecosystem at the same time. The design allows pollutants to be contained inside the marina while absorbing and ridding of gasoline. The boats in this design will charge their batteries through the use of energy efficient wind turbines. The design also follows regulations set by the State of New Jersey. However, this design is not able to provide the necessary amount of slips. The design also uses materials that will last a long time but are sometimes overharvested. It is able to accommodate boats of most sizes but not including the ninety foot boat. The design does not allow the marina to grow and add more boats.
The final solution chosen was solution one. This solution is intended to be developed. It was chosen because it was able to meet the specifications the best, sometimes outperforming the necessary requirements. Most elements of the design were beneficial to having a green marina. The only con of the design was the material chosen to make this design out of. Solutions one and two were very close but solution one was more distinguished in the fact that it was able to hold more than the required number of boats in less space. Solution three was more of an experimental design with the layout. In the end, Solution one was chosen because it was able to meet the specifications the best.
Specification Analysis Chart
Thursday, September 10, 2009
Background
Background Information:
The goal of this project is to design a marina to be eco-friendly. The project is divided into two sections; structural and civil. The structural end of the project will design the marina from the water line out. This includes the design of the docks as well as any coastal structures and mechanism that aid in the design. The civil end will design the marina from the water in. This includes the placement of any buildings and the grade of the slope. It is important change the way we as the human population change the way we do things. We are polluting the only home that we have at alarming rate. We must start taking steps keep the earth cleaner, to stop polluting, and to use resources efficiently.
The marina that is being redesigned is located in Atlantic Highlands, New Jersey. The marina contains 400 slips and 140 moorings. Every aspect of the marina must be designed. The marina must still have the feel of a marina while being environmentally friendly. All of the sights, sounds, and smells of the marina must be authentic. A marina (see figure 1) contains docks, pilings, buildings, ramps, and many other components. Each and every one of these must be improved upon to be made environmentally friendly using eco-friendly materials. The design must solve the problem of erosion caused by tides and water runoff. Local plant life and wildlife must also be taken into account in the design.
Figure 1
Atlantic Highlands Marina
The operation of the marina should be energy efficient. This involves the usage of renewable resources. Wind and solar power would be used almost exclusively because other types of power would not be practical. For example, hydroelectric power would not be an option because it involves using a dam. Solar panels can be placed on the roofs of buildings while wind turbines (see figure 2) can be placed in certain areas of the water. These would power any buildings used in the marina and would also power the boats.
Figure 2
Wind turbine
The structural engineering design must prevent the introduction of pollutants into the water and preserve the edge of the marina while supplying clean energy to the boats. Pollution (see figure 3) would be prevented from entering the water through filtering the storm runoff. The edge of the marina would be preserved through various coastal structures including a breakwater. The breakwater would cause waves to break sooner. This would keep the marina sheltered from the pounding of the waves. Groins would trap any sand that would normally be washed away through wave action. Wind turbines would be placed on coastal structures and solar panels where applicable.
Figure 3
Gasoline floating in the water
The goal of this project is to design a marina to be eco-friendly. The project was divided into structural and civil engineering. The structural engineer will design the marina from the water line out while the civil engineer will design the marina from the water in. The structural engineer designs the docks as well as any coastal structures, mechanisms that aid in the design, and a device capable of absorbing gasoline, while the civil engineer designs the placement of any buildings and the grade of the slope.
Tuesday, September 8, 2009
Calendar
Due Dates
9/11 Background Information, Design Brief, Specifications, Limitations, Testing, and Research
9/18 Brainstorming and Selection/Rejection/Intention Report
10/21 Model and Model Presentation
10/30 Mentor Contacts
11/2-11/4 Presentation
11/5-11/6 Blog Presentation
11/11 Marking Period Ends
Schedual
9/8 Research and Testing
9/9-9/10 Background Information, Design Brief, Specifications, Limitations, Testing, and Research
9/14 Brainstorming
9/15 Brainstorming and Alternate Solutions
9/16 Alternate Solutions and Selection/Rejection/Intention Report
9/17 Selection/Rejection/Intention Report
9/21 Contact Mentor
9/22-9/30 Refine Final Solution
9/30 Contact Mentor
10/1-10/16 Work on Model
10/9 Contact Mentor
10/16 Contact Mentor
10/19-10/20 Prepare for Model Presentation
10/22-10/27 Prepare for Presentation
10/22 Contact Mentor
10/27 Contact Mentor
10/28-10/30 Prepare for Presentation and Blog Presentation
9/11 Background Information, Design Brief, Specifications, Limitations, Testing, and Research
9/18 Brainstorming and Selection/Rejection/Intention Report
10/21 Model and Model Presentation
10/30 Mentor Contacts
11/2-11/4 Presentation
11/5-11/6 Blog Presentation
11/11 Marking Period Ends
Schedual
9/8 Research and Testing
9/9-9/10 Background Information, Design Brief, Specifications, Limitations, Testing, and Research
9/14 Brainstorming
9/15 Brainstorming and Alternate Solutions
9/16 Alternate Solutions and Selection/Rejection/Intention Report
9/17 Selection/Rejection/Intention Report
9/21 Contact Mentor
9/22-9/30 Refine Final Solution
9/30 Contact Mentor
10/1-10/16 Work on Model
10/9 Contact Mentor
10/16 Contact Mentor
10/19-10/20 Prepare for Model Presentation
10/22-10/27 Prepare for Presentation
10/22 Contact Mentor
10/27 Contact Mentor
10/28-10/30 Prepare for Presentation and Blog Presentation