Wednesday, November 18, 2009

Calendar for Second Marking Period

Due Dates:
11/25 Bid Process
12/22 Developmental Work
1/5 Math and Science Analysis, Mentor Contacts
1/11 Formal Progress Update Presentation, Log Sheet

Schedule:
11/15-11/25 Work on Bid Process
11/26-12/22 Work on Developmental Work
12/23-1/5 Work on Math and Science Analysis
1/6-1/11 Prepare for Formal Progress Update Presentation

Mentor Contact will be kept throughout
Logs will be updated two times per week

Tuesday, November 17, 2009

Log 11/17

Task Started: Continued modifying design.


Tasks Completed: Emailed and called Mr. Danko to change time for meeting to review work. Reviewed Green Marina Guidlines.

Tasks to be Completed: Continue calculation of number of wind turbines. Finish modifying design. Make calendar

Friday, November 13, 2009

Log 11/13

Task Started: Started modifying design


Tasks Completed: emailed Mr. Danko to confirm a meeting to review work

Tasks to be Completed: Continue calculation of number of wind turbines. Finish modifying design.

Wednesday, November 11, 2009

Log 11/11

Task Started: Researched marine inverters. started researching information to aid in the process of calculating the number of wind turbines needed to power 400 boats.
Tasks Completed: emailed mentor to discuss the process of calculating the number of wind turbines. Discussion with Cheryl McDonald about floating breakwaters and sediment build-up
Tasks to be Completed: Find more information needed in calculation. Start calculation.

Friday, September 25, 2009

Testing

Testing



The final solution is a green marina. It is expected to perform all necessary functions of a marina while being ecologically friendly. The design is expected to prevent erosion, absorb any gasoline leaked into the water, provide slips for 400 boats, and accommodate boats up to 90 feet long. The design of the marina is going to be tested. This includes the layout of the docks and how well the marina functions as a whole to be ecologically friendly. The final solution will be evaluated by a marine recreational agent. The evaluation would take place during a sit-down interview.


Exploratory Test


Preliminary Testing
1. Schedule meeting with a marine environmental agent to discuss the concept of the design
2. Provide all drawings of final solution and necessary documents
3. Have environmental agent evaluate the concept of the design using the following:


a. Does design contain all necessary parts of a marina?
b. Does design use docking materials efficiently?
c. Does design affect local plants and animals?
d. Does design minimize water pollution?
e. Does design minimize erosion?
f. Does design provide protection from incoming waves?
g. Does design function for all size boats?
h. Does marina function for commercial and recreational boats?
i. Does marina function for all users?
j. Does design follow regulations set forth by the state of New Jersey?
k. Does design meet all requirements for a green marina?
l. Does design meet the needs of boaters?
m. Comments:


4. If changes to design are needed make necessary changes and schedule another meeting


Secondary Testing
1. Meet with a marine environmental agent
2. Provide all drawings of final solution and necessary documents
3. Have environmental agent evaluate the concept of the design using the following:


a. Does design contain all necessary parts of a marina?
b. Does design use docking materials efficiently?
c. Does design affect local plants and animals?
d. Does design minimize water pollution?
e. Does design minimize erosion?
f. Does design provide protection from incoming waves?
g. Does design function for all size boats?
h. Does marina function for commercial and recreational boats?
i. Does marina function for all users?
j. Does design follow regulations set forth by the state of New Jersey?
k. Does design meet all requirements for a green marina?
l. Does design meet the needs of boaters?
m. Comments:


4. If changes to design are needed make necessary changes and schedule another meeting and repeat steps 1-4 for Tertiary Testing


Validation Tests


Primary
1. Schedule meeting with a marine environmental agent
2. Provide all drawings of final solution and necessary documents
3. Have environmental agent evaluate the final solution to ensure all design goals have been met using the following:

a. Does design contain all necessary parts of a marina?
b. Does design match with design of civil engineer?
c. Does design use dock materials efficiently?
d. Does design use materials that are ecologically friendly?
e. Does design use materials that are long lasting?
f. Does design use renewable energy efficiently?
g. Does design affect local plants and animals?
h. Does design minimize water pollution?
i. Does design prevent pollutants from entering the bay?
j. Does design rid gasoline leaked into the water?
k. Does design provide slips for 400 boats?
l. Does design accommodate boats up to 90 feet long?
m. Does design minimize erosion?
n. Does design provide protection from incoming waves
o. Does design function for all size boats?
p. Does marina function for commercial and recreational boats?
q. Does marina function for all users?
r. Does design follow all regulations set forth by the state of New Jersey?
s. Does design meet all requirements for a green marina?
t. Comments:

Brainstorming

Brainstorming


• Boats will leak gasoline
o Use oil absorbent polypropylene fabric boom filled with microbes to consume gasoline



o Float oil spill control fabric in the water to absorb the gasoline

• Renewable energy source
o Install solar panels to create electricity
o Install wind turbines to create electricity


• Docks need to be replaced every few years
o Use fiberglass reinforced plastic in dock construction
o Use reinforced concrete in dock construction

o Use ipe wood in dock construction
o Use Trex decking in dock construction

• Shoreline will erode
o Place WhisprWave floating breakwater parallel to shoreline to prevent wave action against the shore

o Build an artificial salt marsh parallel to shoreline to prevent wave action against the shore

• Waves and wakes from boats disrupt the marina
o Place WhisprWave floating breakwater parallel to shoreline to prevent wave action against the shore
o Build an artificial salt marsh parallel to shoreline to prevent wave action against the shore


• Fishing line and garbage is often discarded in the water
o Place more garbage cans in high-traffic areas
o Skim surface with net

Specifications and Limitations

Specifications:

The design must provide all facilities and services to those who use the harbor
The design must provide adequate parking for all harbor facilities
The design must accommodate boats on land
The design must contain an attractive entrance
The design must plant two trees for ever tree removed
The design must maximize water conservation
The design must minimize water pollution in the form of water run-off and oil spillage
The design must contain vegetation
The design must minimize the use of impervious materials and buildings
The design must include adequate lighting and drainage
The design must prevent erosion
The design must absorb any gasoline leaked into the water
The design must provide slips for 400 boats
The design must accommodate boats up to 90 feet long
The design must provide freshwater access
The design must provide a full service fuel dock with a sanitary pump-out station
The design must provide an 88 ton travel lift and yard
The design must provide bulkhead and retaining walls
The design must minimize the need for and impact of dredging
The design must use stationary docking
The design must minimize water and land pollution
The design must provide protection from incoming waves

Limitations:

The design must adhere to Green Marina compliances
The design must not extend beyond the current perimeter of the harbor
The design must not remove facilities unless the facilities are being replaced by more eco-friendly versions
The design must separate roads from parking areas
The design must not contain more than 40% impervious areas
The design must avoid the intersection of roads
The design must minimize the disturbance of the existing site
The design must adhere to Atlantic Highlands and New Jersey restrictions and regulations
The design must prevent the introduction of pollutants into the bay
The design must use renewable energy in the form of wind turbines and solar panels
The design must be built using long-lasting, environmentally friendly materials