Task Started: Inserting Boat Slips
Tasks Completed: Completed inserting boat slips. Calandar
Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample. Add depth contour lines.
Wednesday, February 3, 2010
Monday, February 1, 2010
Calandar for Third Marking Period
Due Dates:
2/29 Press Release
3/4 Construction Assignment and Assessment
3/11 Formal Progress Update Presentation, Log Sheet
3/17 Mentor Contacts
Schedule:
2/1-2/5 Insert Pilings and Catwalks
2/8-2/12 Insert Depth Markers
2/16-2/19 Insert Miscelaneous Items (Lights, Fire Extinguishers, Electrical Outlets, Wind Turbines, Gasoline, Freshwater Access)
2/22-2/26 Work on Press Release
3/1 Schedule meeting with Mr. Danko to test design
3/1-3/2 Complete Site Plan
3/3 Prepare for Formal Progress Update Presentation
Mentor Contact will be kept throughout
Logs will be updated two times per week
2/29 Press Release
3/4 Construction Assignment and Assessment
3/11 Formal Progress Update Presentation, Log Sheet
3/17 Mentor Contacts
Schedule:
2/1-2/5 Insert Pilings and Catwalks
2/8-2/12 Insert Depth Markers
2/16-2/19 Insert Miscelaneous Items (Lights, Fire Extinguishers, Electrical Outlets, Wind Turbines, Gasoline, Freshwater Access)
2/22-2/26 Work on Press Release
3/1 Schedule meeting with Mr. Danko to test design
3/1-3/2 Complete Site Plan
3/3 Prepare for Formal Progress Update Presentation
Mentor Contact will be kept throughout
Logs will be updated two times per week
Friday, January 29, 2010
Log 1/29
Task Started: Continued detailing marina slips
Tasks Completed: N/A
Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample. Calendar. Add boat slips. Add depth contour lines.
Tasks Completed: N/A
Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample. Calendar. Add boat slips. Add depth contour lines.
Friday, January 22, 2010
Log 1/22
Task Started: Breakwater design.
Tasks Completed: Breakwater Design. Modified developmental work
Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample.
Tasks Completed: Breakwater Design. Modified developmental work
Tasks to be Completed: Complete calculation of number of wind turbines. Continue detailing marina layout. Call company for boom sample.
Wednesday, January 20, 2010
Log 1/20
Task Started: Breakwater design.
Tasks Completed: Formal Report Updated. Mentor Contacts
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work.
Tasks Completed: Formal Report Updated. Mentor Contacts
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work.
Monday, January 11, 2010
Developmental Work
Layout
Strucutal Plan
Boom Attachment
Materials List
1 Oil absorbent polypropylene fabric boom
Quantity: 40
Size: 8” diameter x 20’
Remarks: Cleans water of petroleum based oils
2 Piling Cap
Quantity: 385
Size: 10’x2’x1’
Remarks: Made from reinforced concrete
3 Trex Decking Material
Quantity: 13110
Size: 10’x6”x2”
Remarks: Decking Material
4 Pilings
Quantity: 754
Size: t-1’, b-8”x 16’
Remarks: Made from reinforced concrete
5 WhisprWave Floating Breakwater
Quantity: 1
Size: 1600’ long
Strucutal Plan
Boom Attachment
Materials List
1 Oil absorbent polypropylene fabric boom
Quantity: 40
Size: 8” diameter x 20’
Remarks: Cleans water of petroleum based oils
2 Piling Cap
Quantity: 385
Size: 10’x2’x1’
Remarks: Made from reinforced concrete
3 Trex Decking Material
Quantity: 13110
Size: 10’x6”x2”
Remarks: Decking Material
4 Pilings
Quantity: 754
Size: t-1’, b-8”x 16’
Remarks: Made from reinforced concrete
5 WhisprWave Floating Breakwater
Quantity: 1
Size: 1600’ long
Wednesday, January 6, 2010
Log 1/06
Task Started: Modifying marina layout. Stemm Report
Tasks Completed: Stemm Report
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work. Mentor Contacts
Tasks Completed: Stemm Report
Tasks to be Completed: Complete calculation of number of wind turbines. Complete drawing of breakwater. Continue detailing marina layout. Call company for boom sample. Modify Developmental Work. Mentor Contacts
Subscribe to:
Posts (Atom)